全国凤凰茶楼,楼凤宫.gov.ccn登录入口学生,一品楼龙凤阁论坛

Tunnel construction completed on high-speed railway to China-Vietnam border

Xinhua, November 11, 2021
Size:

With the last tunnel drilled through on Tuesday, the construction of a railway that will allow Chinese high-speed trains to reach the China-Vietnam border has made a significant step forward.

The 46.9-km railway will link the cities of Fangchenggang and Dongxing, both in Guangxi Zhuang Autonomous Region. It has a total of eight tunnels.

Currently, more than 79 percent of construction work has been completed on the railway. Track-laying and communication projects will be arranged later.

After the railway is put into operation, the history of no railway traffic between Fangchenggang and Dongxing will end. Trains on the line can run at a design speed of 200 km per hour, and the travel time between the two cities will be shortened from 90 to 20 minutes.

Dongxing is located at the China-Vietnam border. The line will eventually boost trade and exchanges between China and Southeast Asian countries.  

主站蜘蛛池模板: 巴南区| 岳池县| 长汀县| 齐齐哈尔市| 会同县| 玛曲县| 西昌市| 广饶县| 沈丘县| 闽清县| 盘锦市| 宜章县| 白水县| 邵武市| 东乡| 洛宁县| 商南县| 宜兴市| 白城市| 东至县| 海伦市| 松江区| 滦平县| 武川县| 洛扎县| 泸州市| 徐州市| 理塘县| 金华市| 屯门区| 民权县| 房山区| 东海县| 成都市| 易门县| 蒲城县| 丽水市| 霍山县| 龙陵县| 乐安县| 张北县|